<blockquote id="iygic"></blockquote>

    <blockquote id="iygic"></blockquote>
  • <acronym id="iygic"></acronym>
  • <blockquote id="iygic"></blockquote>
    CASE STUDY / 工程案例
    COFCO Dongtai 300,000 Pigs Farm Biogas Power Generation Project
      Dongtai, Jiangsu   2011
      Treatment capacity: 1284t/d pig manure from 300,000 pigs, pig corpse 5 t/d; Biogas yield: 17,000m3/d Electricity yield: 34,000m3/d GHG reduction: 65,000t CO?/a
    Copyright ? 杭州能源環境工程有限公司 版權所有·浙ICP備09091977號-1
    網站創意:橙就創意
    2021国内久久偷拍_亚洲国产中文黄在线观看_亚洲无码av网页_特黄无码AV在线一区二区
    <blockquote id="iygic"></blockquote>

    <blockquote id="iygic"></blockquote>
  • <acronym id="iygic"></acronym>
  • <blockquote id="iygic"></blockquote>